ADAU1401 DSPmini Learning Board for Studio and Instrument Sound Processing Versatile for Project Delay Compensation and Compensation
PKR 18965
Price Details
Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )
*All items will import from US
QTY:
Ubuy works hard to protect your security and privacy. Our advanced payment security system ensures confidentiality by encrypting your information during transmission using AES (Advanced Encryption Standards) and SSL (Secure Socket Layer) protocols. Your payment details are 100% secure as we do not share your payment details with third party sellers.
The ADAU1401 is a complete single-chip with built-in 28 / 56-bit DSP, dramatically improving the sound.
Fast
Shipping
Free
Return*
Secure Packaging
100% Original Products
PCI DSS Compliance
ISO 27001 Certified
What Stands Out
Product Details
| Compatible Devices | as described |
| Connectivity Technology | as described |
| Number of Channels | 1 |
| Operating System | as described |
| Brand Name | Alksubbm |
| Number of Items | 1 |
| Manufacturer | Alksubbm |
| Model Number | Alksubbm |
| Brand | Alksubbm |
| Item Weight | 0.5 lbs (230 grams) |
Who Should Buy?
-
Audio Engineers
Ideal for audio engineers needing versatile DSP solutions for precise sound processing and delay compensation in studios.
-
Music Students
Great for music students learning about digital signal processing and its applications in studio environments and instruments.
-
DIY Musicians
Perfect for DIY musicians wanting to customize their sound and experiment with different audio processing techniques.
-
Non-Technical Users
Not suitable for users without technical skills or knowledge in DSP, as it requires some expertise to operate effectively.
Product Description
ADAU1401 DSPmini Learning Board for Studio and Instrument Sound Processing Versatile for Project Delay Compensation and Compensation
Customer Questions & Answers
-
Question:
How to Shop ADAU1401 DSPmini Learning Board for Studio and Online From Ubuy?
Answer: It’s easy to shop ADAU1401 DSPmini Learning Board for Studio and online from Ubuy. You just have to search for the product, choose your shipping method while checking out and get it delivered to your location. -
Question:
Is ADAU1401 DSPmini Learning Board for Studio and Available to Shop Online in Pakistan?
Answer: Yes, at Ubuy Pakistan this product is available for you to shop at a reasonable price. The ADAU1401 DSPmini Learning Board for Studio and is not available locally but you can trust us with our express shipping services. -
Question:
How Long Does It Take to Get Product After Placing the Order?
Answer: The delivery time of your ordered product varies as per what you've ordered and the shipping method that you've chosen. The estimated delivery time is mentioned during the checkout process, so be carefree while shopping.
Alksubbm Editorial Review
Customer Reviews & Ratings
-
5 Star
100%
-
4 Star
0%
-
3 Star
0%
-
2 Star
0%
-
1 Star
0%
Review this product
Share your thoughts with other customers
Product Price History
Important information
- Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
- Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.
PKR 18965
Order now and get it around Monday, October 19
This item is not restrict in my country.(Please click on above link if this item is not restrict in your country, So our team will review and allow.)
QTY:
PCI DSS compliant and ISO 27001:2022 certified, with encrypted payments and full buyer protection on every order.
Features & Benefits
- Complete single-chip design for versatile audio processing.
- Built-in 28 / 56-bit DSP for high-quality sound enhancement.
- Self-booting mechanism for easy program loading from EEPROM.
- High dynamic range of 98.5dB for superior audio output.
- Stable performance in harsh conditions from -40° to 105° C.
- Compatible with ADAU1701 and 1702 for expanded learning opportunities.
Ubuy Assurance
Experience worry-free shopping with 100% original products, PCI DSS-compliant payment security, ISO 27001-certified data protection, the fastest cross-border delivery, free returns *, and secure packaging on every order.